landscape_flag_en

 REQUEST: sustainable long-term solution 

The project area was about 265pi2 including a flight of six steps. As part of this project , we have arranged a gray limestone pavement with a strip of black onyx contour . A transition plate was added for access to the sliding door.

RUGGUDIZED STRUCTURE

terrasse_durable

 

MOSAIC

terrasse-bbq

INTERMEDIATE STEP

terrasse-plateau-intermediaire

 

terrasse4_en
WORKS DONE

ASSEMBLY STRUCTURE – SOTA

CUT & INSTALLING PAVERS

INSTALLATION OF SKIRT

INSTALLATION OF ALUMINUM RAMP

PROJECT TYPE – TURNKEY